Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jan 17, 2022     Brake system updates - (2.1 hours)       Category: Fuselage
Removed both brake master cylinders and brake fluid reservoirs, removed all AN fittings. Cleaned all remnants of old sealant because it had been on there a while and because I have learned there are better sealants than what I used the first time. Re-installed all AN fittings using Loctite 567 sealant. Clocked all fittings and the two fluid reservoirs. Replaced AN3 bolts and cotter pins as necessary. Cleaned up all hardware. Lubricated slide tube.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.